Con Edison Storage LDG-01865 (LDG-01865)

Con Edison Storage LDG-01865 is a 1.5 MW battery interconnection project in Bronx, New York with a current status of operational. It is proposed to connect at Parkchester No. 2 / 5X39.

1.5 MWCapacity
OperationalStatus
BronxMarket
BatteryTechnology

Project facts

Canonical nameCon Edison Storage LDG-01865
Queue IDLDG-01865
Statusoperational
Source statusInterconnected
MarketBronx
TechnologyBattery
Capacity1.5 MW
StateNew York
CountyBronx
Point of interconnectionParkchester No. 2 / 5X39
Requested (queue) date
Proposed in-service date
Operational date2023-07-21
Withdrawn date
DeveloperCertain Solar
Utility / transmission ownerCon Edison

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata