Con Edison Storage LDG-01908 (LDG-01908)
Con Edison Storage LDG-01908 is a 1.2 MW battery interconnection project in Westchester, New York with a current status of operational. It is proposed to connect at White Plains / 19U1.
1.2 MWCapacity
OperationalStatus
White PlainsMarket
BatteryTechnology
Project facts
| Canonical name | Con Edison Storage LDG-01908 |
|---|---|
| Queue ID | LDG-01908 |
| Status | operational |
| Source status | Interconnected |
| Market | White Plains |
| Technology | Battery |
| Capacity | 1.2 MW |
| State | New York |
| County | Westchester |
| Point of interconnection | White Plains / 19U1 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2022-03-31 |
| Withdrawn date | — |
| Developer | Distributed Solar Development |
| Utility / transmission owner | Con Edison |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28
Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata