controllable 150 kV HVDC Tie - Import Only (783)

controllable 150 kV HVDC Tie - Import Only is a 400.0 MW generation interconnection project in Addison, Vermont with a current status of withdrawn. It is proposed to connect at a new ~60-mile, 400 MW, ±150 kV, VSC-controlled HVDC transmission line originating from New York Power Authority’s (NYPA) Plattsburgh 230 kV Substation in Plattsburgh, NY and terminating at VELCO’s 345 kV Substation at New Haven, Vermont. The project will deliver a maximum of 400 MW from New York to New England. VGL is an elective transmission upgrade project that will begin in Clinton County, NY, and terminate in Addison County, VT..

400.0 MWCapacity
WithdrawnStatus
VTMarket
GenerationTechnology

Project facts

Canonical namecontrollable 150 kV HVDC Tie - Import Only
Queue ID783
Statuswithdrawn
Source statusW
MarketVT
TechnologyGeneration
Capacity400.0 MW
StateVermont
CountyAddison
Point of interconnectiona new ~60-mile, 400 MW, ±150 kV, VSC-controlled HVDC transmission line originating from New York Power Authority’s (NYPA) Plattsburgh 230 kV Substation in Plattsburgh, NY and terminating at VELCO’s 345 kV Substation at New Haven, Vermont. The project will deliver a maximum of 400 MW from New York to New England. VGL is an elective transmission upgrade project that will begin in Clinton County, NY, and terminate in Addison County, VT.
Requested (queue) date2018-09-18
Proposed in-service date2023-12-31
Operational date
Withdrawn date2019-04-17
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata