Converts QP 164 to combined cycle facility and inc (201)

Converts QP 164 to combined cycle facility and inc is a 162.0 MW gas interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at 345 kV RISE Substation.

162.0 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameConverts QP 164 to combined cycle facility and inc
Queue ID201
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity162.0 MW
StateRhode Island
CountyProvidence
Point of interconnection345 kV RISE Substation
Requested (queue) date2007-02-26
Proposed in-service date2014-02-26
Operational date
Withdrawn date2009-12-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata