Coolidge Solar CNR Only (933)
Coolidge Solar CNR Only is a 19.9 MW solar interconnection project in Windsor, Vermont with a current status of operational. It is proposed to connect at 115 kV Coolidge Substation.
19.9 MWCapacity
OperationalStatus
VTMarket
SolarTechnology
Project facts
| Canonical name | Coolidge Solar CNR Only |
|---|---|
| Queue ID | 933 |
| Status | operational |
| Source status | C |
| Market | VT |
| Technology | Solar |
| Capacity | 19.9 MW |
| State | Vermont |
| County | Windsor |
| Point of interconnection | 115 kV Coolidge Substation |
| Requested (queue) date | 2019-10-22 |
| Proposed in-service date | — |
| Operational date | 2020-11-13 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata