Cooper Ranch 115kV, bus 528554 (ASGI-2014-012)

Cooper Ranch 115kV, bus 528554 is a 10.0 MW solar interconnection project in Lea County, New Mexico with a current status of withdrawn. It is proposed to connect at Cooper Ranch 115kV, bus 528554.

10.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameCooper Ranch 115kV, bus 528554
Queue IDASGI-2014-012
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity10.0 MW
StateNew Mexico
CountyLea County
Point of interconnectionCooper Ranch 115kV, bus 528554
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.