Covert - Palisades 345kV Line (J812)

Covert - Palisades 345kV Line is a 1,108.0 MW gas interconnection project in Van Buren County, Michigan with a current status of withdrawn. It is proposed to connect at Covert - Palisades 345kV Line.

1,108.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameCovert - Palisades 345kV Line
Queue IDJ812
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity1,108.0 MW
StateMichigan
CountyVan Buren County
Point of interconnectionCovert - Palisades 345kV Line
Requested (queue) date2017-06-16
Proposed in-service date2017-06-16
Operational date2017-06-16
Withdrawn date2017-10-26
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.