Coyote Switchyard 345kV Substation (J2883)

Coyote Switchyard 345kV Substation is a 347.0 MW solar interconnection project in Mercer, North Dakota with a current status of withdrawn. It is proposed to connect at Coyote Switchyard 345kV Substation.

347.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCoyote Switchyard 345kV Substation
Queue IDJ2883
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity347.0 MW
StateNorth Dakota
CountyMercer
Point of interconnectionCoyote Switchyard 345kV Substation
Requested (queue) date2022-09-15
Proposed in-service date2027-09-01
Operational date2027-09-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerMONTANA-DAKOTA UTILITIES CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata