CPI Additional Breaker at Harrisburg Substation (L0692)

CPI Additional Breaker at Harrisburg Substation is a 50.0 MW other interconnection project with a current status of active. It is proposed to connect at Harrisburg Substation.

50.0 MWCapacity
ActiveStatus
—Market
OtherTechnology

Project facts

Canonical nameCPI Additional Breaker at Harrisburg Substation
Queue IDL0692
Statusactive
Source statusSTUDY
Market—
TechnologyOther
Capacity50.0 MW
State—
CountyBenton
Point of interconnectionHarrisburg Substation
Requested (queue) date2026-04-29
Proposed in-service date2030-09-01
Operational date—
Withdrawn date—
DeveloperConsumers Power, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-11

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata