Cricket Valley Energy Center (0310)

Cricket Valley Energy Center is a 1,019.9 MW gas interconnection project in Dutchess, New York with a current status of withdrawn. It is proposed to connect at Pleasant Valley - Long Mt. 345kV.

1,019.9 MWCapacity
WithdrawnStatus
GMarket
GasTechnology

Project facts

Canonical nameCricket Valley Energy Center
Queue ID0310
Statuswithdrawn
Source status0
MarketG
TechnologyGas
Capacity1,019.9 MW
StateNew York
CountyDutchess
Point of interconnectionPleasant Valley - Long Mt. 345kV
Requested (queue) date2008-09-22
Proposed in-service date2014-12-31
Operational date
Withdrawn date
DeveloperCricket Valley Energy Center LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata