Cross Town Battery Storage (874)

Cross Town Battery Storage is a 175.0 MW battery interconnection project in Cumberland, Maine with a current status of operational. It is proposed to connect at CMP Mosher 115kV Substation - Lat: 43°41'2.39"N Long: 70°23'56.24"W.

175.0 MWCapacity
OperationalStatus
MEMarket
BatteryTechnology

Project facts

Canonical nameCross Town Battery Storage
Queue ID874
Statusoperational
Source statusC
MarketME
TechnologyBattery
Capacity175.0 MW
StateMaine
CountyCumberland
Point of interconnectionCMP Mosher 115kV Substation - Lat: 43°41'2.39"N Long: 70°23'56.24"W
Requested (queue) date2019-04-08
Proposed in-service date
Operational date2025-11-29
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata