Cross Town Energy Storage (66606_CROS1)

Cross Town Energy Storage is a 175.0 MW battery interconnection project in Cumberland, Maine with a current status of operational.

175.0 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameCross Town Energy Storage
Queue ID66606_CROS1
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity175.0 MW
StateMaine
CountyCumberland
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-11-01
Withdrawn date
Developer
Utility / transmission ownerCross Town Energy Storage LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata