Crossroads 345 kV Substation (GEN-2024-301)

Crossroads 345 kV Substation is a 500.0 MW solar interconnection project in Roosevelt, New Mexico with a current status of withdrawn. It is proposed to connect at Crossroads 345 kV Substation.

500.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameCrossroads 345 kV Substation
Queue IDGEN-2024-301
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity500.0 MW
StateNew Mexico
CountyRoosevelt
Point of interconnectionCrossroads 345 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2029-12-31
Operational date
Withdrawn date2025-12-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata