Crossroads Wind Farm (57332_1-98)

Crossroads Wind Farm is a 227.5 MW wind interconnection project in Dewey, Oklahoma with a current status of operational.

227.5 MWCapacity
OperationalStatus
SWPPMarket
WindTechnology

Project facts

Canonical nameCrossroads Wind Farm
Queue ID57332_1-98
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyWind
Capacity227.5 MW
StateOklahoma
CountyDewey
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2012-01-01
Withdrawn date—
Developer—
Utility / transmission ownerOklahoma Gas & Electric Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata