Croton (1701_2)

Croton is a 3.0 MW other interconnection project in Newaygo, Michigan with a current status of operational.

3.0 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameCroton
Queue ID1701_2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity3.0 MW
StateMichigan
CountyNewaygo
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1907-01-01
Withdrawn date
Developer
Utility / transmission ownerConsumers Energy Co - (MI)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata