Crystal Falls - Aspen 69 kV (J1762)

Crystal Falls - Aspen 69 kV is a 22.5 MW solar interconnection project in Iron, Michigan with a current status of withdrawn. It is proposed to connect at Crystal Falls - Aspen 69 kV.

22.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCrystal Falls - Aspen 69 kV
Queue IDJ1762
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity22.5 MW
StateMichigan
CountyIron
Point of interconnectionCrystal Falls - Aspen 69 kV
Requested (queue) date2020-06-24
Proposed in-service date2023-09-15
Operational date2023-09-15
Withdrawn date2021-02-19
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.