Crystal Springs Hydroelectric, L.P. (596)

Crystal Springs Hydroelectric, L.P. is a 2.5 MW other interconnection project in Twin Falls, Idaho with a current status of operational. It is proposed to connect at Distribution Feeder.

2.5 MWCapacity
OperationalStatus
IDMarket
OtherTechnology

Project facts

Canonical nameCrystal Springs Hydroelectric, L.P.
Queue ID596
Statusoperational
Source statusIn Service
MarketID
TechnologyOther
Capacity2.5 MW
StateIdaho
CountyTwin Falls
Point of interconnectionDistribution Feeder
Requested (queue) date2020-06-30
Proposed in-service date
Operational date2021-05-01
Withdrawn date
DeveloperCrystal Springs Hydroelectric, L.P.
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata