CTUC Interconnection (L0406)

CTUC Interconnection is a 6.0 MW other interconnection project in Grant, Washington with a current status of withdrawn. It is proposed to connect at East Omak-Grand Coulee or Grand Coulee-Okanogan #2.

6.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameCTUC Interconnection
Queue IDL0406
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity6.0 MW
StateWashington
CountyGrant
Point of interconnectionEast Omak-Grand Coulee or Grand Coulee-Okanogan #2
Requested (queue) date2016-12-09
Proposed in-service date2019-10-01
Operational date
Withdrawn date
DeveloperColville Tribes
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.