Cuba Solar Farm (1591)
Cuba Solar Farm is a 20.0 MW other interconnection project in Allegany, New York with a current status of withdrawn. It is proposed to connect at 115 kV transmission line between HOMER HILL substation and ANDOVER #157 substation.
20.0 MWCapacity
WithdrawnStatus
AMarket
OtherTechnology
Project facts
| Canonical name | Cuba Solar Farm |
|---|---|
| Queue ID | 1591 |
| Status | withdrawn |
| Source status | 0 |
| Market | A |
| Technology | Other |
| Capacity | 20.0 MW |
| State | New York |
| County | Allegany |
| Point of interconnection | 115 kV transmission line between HOMER HILL substation and ANDOVER #157 substation |
| Requested (queue) date | 2023-08-07 |
| Proposed in-service date | 2024-11-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Apalachin Solar LLC |
| Utility / transmission owner | NM-NG |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-13 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.