Cuba Solar Farm (1591)

Cuba Solar Farm is a 20.0 MW other interconnection project in Allegany, New York with a current status of withdrawn. It is proposed to connect at 115 kV transmission line between HOMER HILL substation and ANDOVER #157 substation.

20.0 MWCapacity
WithdrawnStatus
AMarket
OtherTechnology

Project facts

Canonical nameCuba Solar Farm
Queue ID1591
Statuswithdrawn
Source status0
MarketA
TechnologyOther
Capacity20.0 MW
StateNew York
CountyAllegany
Point of interconnection115 kV transmission line between HOMER HILL substation and ANDOVER #157 substation
Requested (queue) date2023-08-07
Proposed in-service date2024-11-30
Operational date
Withdrawn date
DeveloperApalachin Solar LLC
Utility / transmission ownerNM-NG

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-13new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.