Cuba Wind Project (1228)

Cuba Wind Project is a 86.5 MW wind interconnection project in Alleghany, New York with a current status of withdrawn. It is proposed to connect at Homer Hill - Andover 115 kV Line #157.

86.5 MWCapacity
WithdrawnStatus
AMarket
WindTechnology

Project facts

Canonical nameCuba Wind Project
Queue ID1228
Statuswithdrawn
Source status0
MarketA
TechnologyWind
Capacity86.5 MW
StateNew York
CountyAlleghany
Point of interconnectionHomer Hill - Andover 115 kV Line #157
Requested (queue) date2021-08-12
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperSWEB Development USA, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata