Cumberland-W. Shore #1 69kV (X2-004)

Cumberland-W. Shore #1 69kV is a 20.0 MW solar interconnection project in Cumberland, Pennsylvania with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCumberland-W. Shore #1 69kV
Queue IDX2-004
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity20.0 MW
StatePennsylvania
CountyCumberland
Point of interconnection
Requested (queue) date2011-05-05
Proposed in-service date2012-12-15
Operational date
Withdrawn date2011-11-14
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.