Cumberland - W. Shore #1 69kV is a 20.0 MW solar interconnection project in Cumberland, Pennsylvania with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameCumberland - W. Shore #1 69kV
Queue IDX4-009
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity20.0 MW
StatePennsylvania
CountyCumberland
Point of interconnection—
Requested (queue) date2011-11-17
Proposed in-service date2014-07-01
Operational date—
Withdrawn date2013-07-01
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.