CW Bill Young Hydropower Project (69697_CW-6)
CW Bill Young Hydropower Project is a 1.2 MW other interconnection project in Allegheny, Pennsylvania with a current status of active.
1.2 MWCapacity
ActiveStatus
PJMMarket
OtherTechnology
Project facts
| Canonical name | CW Bill Young Hydropower Project |
|---|---|
| Queue ID | 69697_CW-6 |
| Status | active |
| Source status | (L) Regulatory approvals pending. Not under construction |
| Market | PJM |
| Technology | Other |
| Capacity | 1.2 MW |
| State | Pennsylvania |
| County | Allegheny |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2031-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | C.W. Bill Young Hydropower Group, Inc |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata