CWW 300 MW DUN (0814)

CWW 300 MW DUN is a 300.0 MW wind interconnection project in Chautauqua, New York with a current status of withdrawn. It is proposed to connect at Dunkirk Substation 230kV.

300.0 MWCapacity
WithdrawnStatus
AMarket
WindTechnology

Project facts

Canonical nameCWW 300 MW DUN
Queue ID0814
Statuswithdrawn
Source status0
MarketA
TechnologyWind
Capacity300.0 MW
StateNew York
CountyChautauqua
Point of interconnectionDunkirk Substation 230kV
Requested (queue) date2019-04-03
Proposed in-service date2021-02-28
Operational date
Withdrawn date
DeveloperDiamond Generating Corporation
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.