CWW 300 Wind (0813)

CWW 300 Wind is a 300.0 MW wind interconnection project in Erie, New York with a current status of withdrawn. It is proposed to connect at Harbor Front 115kV.

300.0 MWCapacity
WithdrawnStatus
AMarket
WindTechnology

Project facts

Canonical nameCWW 300 Wind
Queue ID0813
Statuswithdrawn
Source status0
MarketA
TechnologyWind
Capacity300.0 MW
StateNew York
CountyErie
Point of interconnectionHarbor Front 115kV
Requested (queue) date2019-04-03
Proposed in-service date2021-02-28
Operational date
Withdrawn date
DeveloperDiamond Generating Corporation
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata