D150S Project (LG-17-9-1)

D150S Project is a 150.0 MW solar+battery interconnection project in Dona Ana, New Mexico with a current status of suspended. It is proposed to connect at Diablo 115 kV Substation.

150.0 MWCapacity
SuspendedStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameD150S Project
Queue IDLG-17-9-1
Statussuspended
Source statussuspended
MarketWest
TechnologySolar+Battery
Capacity150.0 MW
StateNew Mexico
CountyDona Ana
Point of interconnectionDiablo 115 kV Substation
Requested (queue) date2017-09-06
Proposed in-service date2020-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata