Darlington - Hillman 138kV Line (Falcon Substation J395) (J807)

Darlington - Hillman 138kV Line (Falcon Substation J395) is a 41.4 MW wind interconnection project in Lafayette County, Wisconsin with a current status of withdrawn. It is proposed to connect at Darlington - Hillman 138kV Line (Falcon Substation J395).

41.4 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameDarlington - Hillman 138kV Line (Falcon Substation J395)
Queue IDJ807
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity41.4 MW
StateWisconsin
CountyLafayette County
Point of interconnectionDarlington - Hillman 138kV Line (Falcon Substation J395)
Requested (queue) date2017-06-16
Proposed in-service date2020-09-15
Operational date2020-09-15
Withdrawn date2020-05-26
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata