Dauphin PG Tie–Dauphin Juniata Tie 69 k (AF2-082)

Dauphin PG Tie–Dauphin Juniata Tie 69 k is a 55.0 MW solar interconnection project in Dauphin, Pennsylvania with a current status of withdrawn.

55.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameDauphin PG Tie–Dauphin Juniata Tie 69 k
Queue IDAF2-082
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity55.0 MW
StatePennsylvania
CountyDauphin
Point of interconnection—
Requested (queue) date2020-01-31
Proposed in-service date2027-08-31
Operational date—
Withdrawn date2025-06-26
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.