Davenport Solar (763)

Davenport Solar is a 15.0 MW solar interconnection project in Rutland, Vermont with a current status of withdrawn. It is proposed to connect at Florence - S. Middlebury Jct. 46 kV line, approx. 4 miles from Florence.

15.0 MWCapacity
WithdrawnStatus
VTMarket
SolarTechnology

Project facts

Canonical nameDavenport Solar
Queue ID763
Statuswithdrawn
Source statusW
MarketVT
TechnologySolar
Capacity15.0 MW
StateVermont
CountyRutland
Point of interconnectionFlorence - S. Middlebury Jct. 46 kV line, approx. 4 miles from Florence
Requested (queue) date2018-04-27
Proposed in-service date2021-12-01
Operational date
Withdrawn date2022-06-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata