Deerfield Wind (276)

Deerfield Wind is a 30.0 MW wind interconnection project in Bennington, Vermont with a current status of withdrawn. It is proposed to connect at Y-25 North, 69 kV line between Searsburg and Benni.

30.0 MWCapacity
WithdrawnStatus
WMAMarket
WindTechnology

Project facts

Canonical nameDeerfield Wind
Queue ID276
Statuswithdrawn
Source statusW
MarketWMA
TechnologyWind
Capacity30.0 MW
StateVermont
CountyBennington
Point of interconnectionY-25 North, 69 kV line between Searsburg and Benni
Requested (queue) date2008-09-02
Proposed in-service date2013-12-31
Operational date
Withdrawn date2014-09-11
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.