Deerfield Wind Project (477)

Deerfield Wind Project is a 30.0 MW wind interconnection project in Bennington, Vermont with a current status of operational. It is proposed to connect at Future GMP Putnam Road 69 kV Substation on Y-25N Line.

30.0 MWCapacity
OperationalStatus
WMAMarket
WindTechnology

Project facts

Canonical nameDeerfield Wind Project
Queue ID477
Statusoperational
Source statusC
MarketWMA
TechnologyWind
Capacity30.0 MW
StateVermont
CountyBennington
Point of interconnectionFuture GMP Putnam Road 69 kV Substation on Y-25N Line
Requested (queue) date2014-09-19
Proposed in-service date
Operational date2019-06-01
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.