Delaware - Neosho 345 kV (GEN-2023-076)

Delaware - Neosho 345 kV is a 100.0 MW wind interconnection project in Nowata/Craig, Oklahoma with a current status of withdrawn. It is proposed to connect at Delaware - Neosho 345 kV.

100.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameDelaware - Neosho 345 kV
Queue IDGEN-2023-076
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity100.0 MW
StateOklahoma
CountyNowata/Craig
Point of interconnectionDelaware - Neosho 345 kV
Requested (queue) date2023-10-02
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerEvergy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.