Derry Tap- Derry Bus 69 kV VII (AH1-472)

Derry Tap- Derry Bus 69 kV VII is a 56.0 MW solar interconnection project in Columbia, Pennsylvania with a current status of withdrawn.

56.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameDerry Tap- Derry Bus 69 kV VII
Queue IDAH1-472
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity56.0 MW
StatePennsylvania
CountyColumbia
Point of interconnection—
Requested (queue) date2021-09-10
Proposed in-service date2023-09-25
Operational date—
Withdrawn date2024-12-18
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata