Detroit/Guilford/Belfast DG Area Study (1255)

Detroit/Guilford/Belfast DG Area Study is a 57.7 MW solar+battery interconnection project in Piscataquis/Penobscot/Somerset/Waldo/Hancock, Maine with a current status of withdrawn. It is proposed to connect at CMP Detroit 115 kV Substation.

57.7 MWCapacity
WithdrawnStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameDetroit/Guilford/Belfast DG Area Study
Queue ID1255
Statuswithdrawn
Source statusW
MarketME
TechnologySolar+Battery
Capacity57.7 MW
StateMaine
CountyPiscataquis/Penobscot/Somerset/Waldo/Hancock
Point of interconnectionCMP Detroit 115 kV Substation
Requested (queue) date2022-05-02
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata