Dewey 138kV (GEN-2011-060)

Dewey 138kV is a 80.0 MW wind interconnection project in Dewey County, Oklahoma with a current status of withdrawn. It is proposed to connect at Dewey 138kV.

80.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameDewey 138kV
Queue IDGEN-2011-060
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity80.0 MW
StateOklahoma
CountyDewey County
Point of interconnectionDewey 138kV
Requested (queue) date2011-12-02
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.