Dickinson County Switch Yard 161kV (J1776)

Dickinson County Switch Yard 161kV is a 34.0 MW wind interconnection project in Osceola, Iowa with a current status of withdrawn. It is proposed to connect at Dickinson County Switch Yard 161kV.

34.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameDickinson County Switch Yard 161kV
Queue IDJ1776
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity34.0 MW
StateIowa
CountyOsceola
Point of interconnectionDickinson County Switch Yard 161kV
Requested (queue) date2020-06-25
Proposed in-service date2023-12-01
Operational date2023-12-01
Withdrawn date2020-10-08
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.