Donaldsonville - Evergreen 230 kV is a 50.0 MW battery interconnection project in Iberville, Louisiana with a current status of withdrawn. It is proposed to connect at Donaldsonville - Evergreen 230 kV.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameDonaldsonville - Evergreen 230 kV
Queue IDJ2220
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateLouisiana
CountyIberville
Point of interconnectionDonaldsonville - Evergreen 230 kV
Requested (queue) date2021-12-21
Proposed in-service date2024-10-30
Operational date2024-10-30
Withdrawn date2025-03-07
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.