Doud Tap 161 kV Substation (J1050)

Doud Tap 161 kV Substation is a 225.0 MW wind interconnection project in Boone County,Hamilton County, Iowa with a current status of operational. It is proposed to connect at Doud Tap 161 kV Substation.

225.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameDoud Tap 161 kV Substation
Queue IDJ1050
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity225.0 MW
StateIowa
CountyBoone County,Hamilton County
Point of interconnectionDoud Tap 161 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2022-06-03
Operational date2022-06-03
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata