Douglas (114_1)

Douglas is a 26.1 MW other interconnection project in Cochise, Arizona with a current status of operational.

26.1 MWCapacity
OperationalStatus
AZPSMarket
OtherTechnology

Project facts

Canonical nameDouglas
Queue ID114_1
Statusoperational
Source status(OP) Operating
MarketAZPS
TechnologyOther
Capacity26.1 MW
StateArizona
CountyCochise
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1972-05-01
Withdrawn date
Developer
Utility / transmission ownerArizona Public Service

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata