Downeast Wind (760)

Downeast Wind is a 126.0 MW wind interconnection project in Washington, Maine with a current status of operational. It is proposed to connect at Primary POI: Emera Maine 115 line 52 near Epping switching station Alternate POI: Epping station.

126.0 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical nameDowneast Wind
Queue ID760
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity126.0 MW
StateMaine
CountyWashington
Point of interconnectionPrimary POI: Emera Maine 115 line 52 near Epping switching station Alternate POI: Epping station
Requested (queue) date2018-04-26
Proposed in-service date
Operational date2025-05-29
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.