Doyle 115 (GI-019)

Doyle 115 is a 195.0 MW gas interconnection project with a current status of operational. It is proposed to connect at Winder Primary 115 kV Sub.

195.0 MWCapacity
OperationalStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameDoyle 115
Queue IDGI-019
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyGas
Capacity195.0 MW
State
County
Point of interconnectionWinder Primary 115 kV Sub
Requested (queue) date2023-12-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGTC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata