Drummond-Macks Inn 46 kV to 115 kV Conversion (L0505)
Drummond-Macks Inn 46 kV to 115 kV Conversion is a 8.3 MW other interconnection project in Fremont, Idaho with a current status of active. It is proposed to connect at Drummond-Macks Inn No 1 115kV line.
8.3 MWCapacity
ActiveStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | Drummond-Macks Inn 46 kV to 115 kV Conversion |
|---|---|
| Queue ID | L0505 |
| Status | active |
| Source status | STUDY |
| Market | ID |
| Technology | Other |
| Capacity | 8.3 MW |
| State | Idaho |
| County | Fremont |
| Point of interconnection | Drummond-Macks Inn No 1 115kV line |
| Requested (queue) date | 2021-10-21 |
| Proposed in-service date | 2026-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Fall River Rural Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata