Du Pont - Cobb -White Lake 138kv (J1375)

Du Pont - Cobb -White Lake 138kv is a 100.0 MW solar interconnection project in Muskegon County, Michigan with a current status of operational. It is proposed to connect at Du Pont - Cobb -White Lake 138kv.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameDu Pont - Cobb -White Lake 138kv
Queue IDJ1375
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateMichigan
CountyMuskegon County
Point of interconnectionDu Pont - Cobb -White Lake 138kv
Requested (queue) date2019-04-29
Proposed in-service date2023-09-29
Operational date2023-09-29
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.