Duane Arnold 161kV (R1042)

Duane Arnold 161kV is a 64.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Duane Arnold 161kV.

64.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameDuane Arnold 161kV
Queue IDR1042
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGeneration
Capacity64.0 MW
State
CountyLinn
Point of interconnectionDuane Arnold 161kV
Requested (queue) date2022-10-22
Proposed in-service date2023-10-01
Operational date2023-10-01
Withdrawn date2025-05-13
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.