Duane Arnold (J4235)

Duane Arnold is a 400.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Duane Arnold.

400.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameDuane Arnold
Queue IDJ4235
Statusoperational
Source statusActive
Market
TechnologyGeneration
Capacity400.0 MW
State
CountyLinn
Point of interconnectionDuane Arnold
Requested (queue) date2026-03-21
Proposed in-service date2031-06-30
Operational date2031-06-30
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata