Duke Energy CHP at Clemson University (63063_GT01)

Duke Energy CHP at Clemson University is a 13.4 MW gas interconnection project in Pickens, South Carolina with a current status of operational.

13.4 MWCapacity
OperationalStatus
DUKMarket
GasTechnology

Project facts

Canonical nameDuke Energy CHP at Clemson University
Queue ID63063_GT01
Statusoperational
Source status(OP) Operating
MarketDUK
TechnologyGas
Capacity13.4 MW
StateSouth Carolina
CountyPickens
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-12-01
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata