Dundee Wind Increase (301)

Dundee Wind Increase is a 3.9 MW wind interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at BHE Keene Rd Substation.

3.9 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical nameDundee Wind Increase
Queue ID301
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity3.9 MW
StateMaine
CountyPenobscot
Point of interconnectionBHE Keene Rd Substation
Requested (queue) date2009-05-28
Proposed in-service date
Operational date2011-07-26
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata