Dundee Wind Increase is a 3.9 MW wind interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at BHE Keene Rd Substation.
3.9 MWCapacity
OperationalStatus
BHEMarket
WindTechnology
Project facts
| Canonical name | Dundee Wind Increase |
|---|---|
| Queue ID | 301 |
| Status | operational |
| Source status | C |
| Market | BHE |
| Technology | Wind |
| Capacity | 3.9 MW |
| State | Maine |
| County | Penobscot |
| Point of interconnection | BHE Keene Rd Substation |
| Requested (queue) date | 2009-05-28 |
| Proposed in-service date | — |
| Operational date | 2011-07-26 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata