Dunkirk Unit 2 (0523)

Dunkirk Unit 2 is a 75.0 MW gas interconnection project in Chautauqua, New York with a current status of withdrawn. It is proposed to connect at Dunkirk 115kV.

75.0 MWCapacity
WithdrawnStatus
AMarket
GasTechnology

Project facts

Canonical nameDunkirk Unit 2
Queue ID0523
Statuswithdrawn
Source status0
MarketA
TechnologyGas
Capacity75.0 MW
StateNew York
CountyChautauqua
Point of interconnectionDunkirk 115kV
Requested (queue) date2015-12-17
Proposed in-service date2020-06-30
Operational date
Withdrawn date
DeveloperDunkirk Power LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.