Dworshak Fourth Unit (G0492)
Dworshak Fourth Unit is a 300.0 MW other interconnection project in Clearwater, Idaho with a current status of active. It is proposed to connect at Dworshak Substation..
300.0 MWCapacity
ActiveStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | Dworshak Fourth Unit |
|---|---|
| Queue ID | G0492 |
| Status | active |
| Source status | STUDY COMPLETED |
| Market | ID |
| Technology | Other |
| Capacity | 300.0 MW |
| State | Idaho |
| County | Clearwater |
| Point of interconnection | Dworshak Substation. |
| Requested (queue) date | 2013-08-02 |
| Proposed in-service date | 2019-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | BPA Power Services |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata