E C Gaston (26_3)

E C Gaston is a 272.0 MW gas interconnection project in Shelby, Alabama with a current status of operational.

272.0 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameE C Gaston
Queue ID26_3
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity272.0 MW
StateAlabama
CountyShelby
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1961-06-01
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata